Hazardous Waste
Contract
Radon Survey
1. Project Background
(What has the client hired you to do? What basic information do you have on the project?)
2. Scope of Work
(Provide a detailed description of what you will do. A bulleted list is a good way to clearly describe to the client your step by step procedures.)
3. Cost of Work
(Research costs Online. These can be basic estimates.)
4. Project Deliverables
(What will you provide to the client at the end of the project?)
5. Project Timetable
(Include estimates of when each part of the project will be completed.)
Instructions In this assignment, you are an environmental consultant who has been hired by the owner of a commercial building to complete a radon survey. His building is three stories high with a basement that is mostly below ground. The basement is finished, and there are people who work in the basement level as well as on the other two floors. Your client wants you to send him a detailed contract. Use the contract template attached to describe how you will conduct the radon survey on his building. Be sure to include the following information in your scope of work: What type of radon testing devices will you use? Where will you place the devices? What is the timeframe of the testing? At the end of your contract, include an APA-formatted reference page. All source material must be referenced; paraphrased and quoted material must have accompanying citations. The assignment should consist of at least one page, not including your reference page.